MINING & TAILINGS | HIGH-SOLIDS SLURRY PUMPING

Move More Solids.
Waste Less Water.

Have a difficult mining slurry or tailings application? Let our engineers review the material, solids concentration, particle size, slurry density, flow, TDH, discharge distance, elevation, available power and deployment method—and help determine the right pump and system configuration.

Built for abrasive, high-solids slurry, difficult material and demanding mining duty cycles.



 

Tell Us About Your Slurry / Tailings Application

High-Solids Slurry
High-Solids Slurry
Abrasive material
Abrasive material
Oversized solids
Oversized solids

Long-distance transfer
Long-distance transfer
eddypump-plant-mine-operations-keep-throughput-moving-1080x1080

PLANT + MINE OPERATIONS
Keep Throughput Moving

When the pumping system cannot keep up with the material, the impact reaches the rest of the operation. Review the slurry, production target and transfer conditions so the pumping system supports—not limits—the production plan.

eddypump-maintenance-reliability-reduce-repeat-maintenance-1080x1080

MAINTENANCE + RELIABILITY
Reduce Repeat Maintenance

Wear, clogging, service intervals, access, spare parts and unplanned downtime all affect lifecycle cost. Evaluate the actual solids-handling duty before repeat failures become part of normal maintenance.

eddypump-process-tailings-engineering-prove-the-application-fit-1080x1080

PROCESS + TAILINGS ENGINEERING
Prove the Application Fit

Bring the slurry SG, solids %, particle size, viscosity, flow, TDH, pipeline, elevation, available power and duty cycle. We’ll work through the pump and system requirements around the actual material.

eddypump-capital-projects-procurement-buy-around-project-risk-1080x1080

CAPITAL PROJECTS + PROCUREMENT
Buy Around Project Risk

Pump price matters. So do production risk, equipment standardization, serviceability, delivery, support, power, pipeline and lifecycle maintenance. Start with an application-based requirement before comparing equipment.

CUSTOMER PROOF | HIGH-VISCOSITY MINING SLURRY
More Than 500,000 Cubic Yards of Red Mud Moved

In EDDY Pump’s published Rio Tinto red-mud application, a 10-inch EDDY Pump moved highly viscous bauxite residue measured at around 40% solids and more than 1,000 cP.
EDDY reports that the system moved more than 500,000 cubic yards, maintained approximately 1,200 GPM and pumped the material over a distance greater than 1.5 miles.

eddypump-more-than-500000-cubic-yards-of-red-mud-moved-1600x900

When Is Your Next Slurry or Tailings Project?

A Different Pump Geometry for Dense, Abrasive Slurry

EDDY Pump uses a recessed open-rotor design with wide internal clearances. For dense slurry, abrasive particles and oversized solids, the design is intended to give material a less restrictive path through the pump and reduce sensitivity to clogging and close-tolerance wear mechanisms.

Final performance still depends on the complete duty point, so the pump and pipeline should be reviewed together.

Recessed open rotor

 Recessed open rotor

High-solids slurry applications-1

 High-solids slurry applications

Multiple configurations-1

Multiple configurations

Application Engineering-1

 Application Engineering

eddypump-a different-pump-geometry-for-difficult-slurry1600x900

Where the Application Review Can Start

Different mining applications create different pumping requirements. Start with the material, transfer conditions and production target, then review the system around the actual duty.

Scale the Pump Platform to the Duty

The current EDDY Pump slurry-pump family spans multiple sizes and configurations for solids-handling applications.
The 16-inch HD-16000 platform, for example, is listed at 10,000–13,000 GPM, solids handling up to 15 inches and 40–70% solids by weight.

Model selection must be confirmed against the actual slurry, TDH, pipeline, available power and duty cycle.

eddypump-16-Inch Slurry Pump  HD-16000-1600x900
eddypump-90,000-cubic-yards-pumped-about-4200-feet-1600x900

HISTORICAL PROJECT PROOF | COAL TAILINGS
90,000 Cubic Yards Pumped About 4,200 Feet

In an EDDY Pump historical project summary, approximately 90,000 cubic yards of coal tailings were pumped about 4,200 feet without a booster pump while operating 24 hours per day, six days per week.

The published summary reported 40–80% solids by volume at discharge.

90,000 CY

~90,000 CY

4,200 ft

~4,200 ft

24 hrday, 6 daysweek

24 hr/day, 6 days/week

40–80_ solids by volume at discharge

40–80% solids by volume at discharge

Bring Us the Slurry Application

A useful pump recommendation starts with the job, not the catalog.

Send us what you know about the material, solids concentration, slurry density, particle size, production target, TDH, discharge distance, elevation, available power and site constraints.

Our team can help identify missing inputs and review the pump and system requirements. 

Have limited data? 
Send what you have. An application engineer can help identify what is still needed.

 Terms & Conditions - Privacy Policy

Copyright © 2026, Eddy Pump